What it shows
The Model for Improvement, developed by Associates in Process Improvement (Langley et al., 2009), has two parts: three questions that set the aim, the measures and the change; and the plan-do-study-act (PDSA) cycle, which tests the change. The three questions are quoted on the drawing. Each stage’s tasks follow Taylor et al. (2014), with one addition from the Institute for Healthcare Improvement: “adapt” as an option at Act.
PDSA comes from the work of Shewhart and Deming. The name plan-do-check-act (PDCA) came into use after Deming’s early teaching in Japan, and the two are often used interchangeably (Taylor et al., 2014). The worked example is a fictional clinic that wants to cut missed appointments from 18% to 10% by June. Its first test sends a text reminder 48 hours before each visit to one doctor’s patients, and two more cycles scale the test up.
How to read it
Read the three questions first, left to right: the aim, how the clinic will know a change is an improvement and the change it will test. One arrow runs from all three into the wheel, because the questions can be answered in any order.
Plan, at top right: text one doctor’s patients for one week, and predict that missed visits will fall to 10%.
In Do, 60 reminders go out, and 4 phone numbers turn out to be out of date.
Study sets the result against the prediction: 7 of 60 visits were missed (12%), short of the 10% predicted. That comparison is what turns a trial into a test.
Act: update phone numbers at check-in, then test with two doctors. The ramp under the wheel shows cycles 2 and 3 growing in scale.
The questions and the first cycle
- Aim: “What are we trying to accomplish?” Cut missed appointments from 18% to 10% by June.
- Measures: “How will we know that a change is an improvement?” The share of appointments missed each week.
- Changes: “What change can we make that will result in improvement?” A text reminder 48 hours before each visit.
- Cycle 1: one doctor, one week, 60 reminders, 7 visits missed (12%) against a prediction of 10%.
- Scale: cycle 2 runs with two doctors for two weeks, cycle 3 with all four doctors for one month.
Ways to use it in teaching
Assign Taylor et al. (2014), a systematic review of how the method is used in health care, and have students check this example against three of the features it looks for: iterative cycles, a prediction for each test and tests that start small.
Before showing the ramp, ask students to write the clinic’s cycle 2 Plan, with its own prediction. What would they do if cycle 2 also fell short of 10%?
Ask where the clinic’s weekly measure, the share of appointments missed, sits in the Donabedian model: structure, process or outcome? Then have students name an outcome measure the same clinic could track.
Sources
- Institute for Healthcare Improvement. (n.d.). Model for improvement. Retrieved November 16, 2026, from https://www.ihi.org/library/model-for-improvement
- Langley, G. J., Moen, R. D., Nolan, K. M., Nolan, T. W., Norman, C. L., & Provost, L. P. (2009). The improvement guide: A practical approach to enhancing organizational performance (2nd ed.). Jossey-Bass.
- Taylor, M. J., McNicholas, C., Nicolay, C., Darzi, A., Bell, D., & Reed, J. E. (2014). Systematic review of the application of the plan–do–study–act method to improve quality in healthcare. BMJ Quality & Safety, 23(4), 290–298. https://doi.org/10.1136/bmjqs-2013-001862